robdyck

Schedule from spreadsheet to Chief

Recommended Posts

I use a spreadsheet to perform certain calculations, then I copy the cells and paste into Chief. When I do this, it imports cell borders, but I'm not sure if the line weight of these borders can be controlled. They are much heavier than I typically use. Does anyone know if this can be controlled? 

image.thumb.png.9939bc62f4c46f7d3b11fb12cdb9b76f.png

Share this post


Link to post
Share on other sites
19 minutes ago, robdyck said:

I use a spreadsheet to perform certain calculations, then I copy the cells and paste into Chief. When I do this, it imports cell borders, but I'm not sure if the line weight of these borders can be controlled. They are much heavier than I typically use. Does anyone know if this can be controlled? 

image.thumb.png.9939bc62f4c46f7d3b11fb12cdb9b76f.png

2 best options I can think of...

1.  Paste without the borders into Rich Text Box and add your own afterward.

2.  Better yet, paste into a standard text box and Display Grid Lines. 

 

You can then simply reuse the Text Box and/or manually created grids for future plans.

  • Upvote 1

Share this post


Link to post
Share on other sites
14 minutes ago, Alaskan_Son said:

Better yet, paste into a standard text box and Display Grid Lines. 

Thanks Michael. Not sure why I didn't think of that! That provide the line weight control I asked for. 

image.thumb.png.e62dcde1f15bd10872fb9e07763f94f5.png

 

And 2 separate text boxes will provide the appropriate text alignment:

image.thumb.png.3991038c68d6763a9fc8ed3282392383.png

 

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    28108
    Total Members
    6254
    Most Online
    mhdjawwad
    Newest Member
    mhdjawwad
    Joined