Layout Schedules - not good enough yet


robdyck
 Share

Recommended Posts

Is it really possible that the Layout Revision Table doesn't allow 1 revision entry for  multiple affected pages? For example, I need to show a revision for pages 1-3 out of 4. If I place the revision table on page 0, the description doesn't show up on the other pages, plus there's no 2D symbol column. 

 

Also...Is it really possible that a Layout Cad detail allows NOTES but no Note Schedule?

How can a simple revision table can be made so time consuming? Back to plain old standard Text, it won't let me down!

Link to comment
Share on other sites

On 5/22/2020 at 12:31 PM, robdyck said:

Also...Is it really possible that a Layout Cad detail allows NOTES but no Note Schedule?

 

Apparently yes :(  I don't usually do "work" in Layout so I had never noticed Schedules can't be made in Layout. So I guess that work would need to be done back in Plan then sent to layout.

 

As for a 2D Image ...No , that is not an Option like other Schedules either.

 

However the Revision table it seems to work fine for me.....but maybe I misunderstand the Issue? 

 

........ however if you don't add the Description when you Add the Revision, you then need to use Edit Page Information on each Page to do it , it you add it when you make the Revision it then populates to the assigned pages eg 1-3 or 1-5 etc.... 

 

Mick

 

image.thumb.png.876226f6400f48084a07d259cf661782.png

 

 

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share