Sign in to follow this  
Rpadge

Wall Framing start point

Recommended Posts

It looks like the wall framing (maybe joists as well) start their layout from the front of a structure, is there a way to have the O.C. spacing start from the rear? 

Share this post


Link to post
Share on other sites

Framing Reference Marker may do what you want.

  • Upvote 1

Share this post


Link to post
Share on other sites

Perfect, thank you very much.

 

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
Sign in to follow this  

  • Member Statistics

    28422
    Total Members
    9156
    Most Online
    SpacemakerHE
    Newest Member
    SpacemakerHE
    Joined