Excited about this and still figurinf it out, however, this is bugging me.

343570180_WALLSCHEDULE.thumb.jpg.f3d13ee34218d5409f51c04894d34527.jpg

I first did the as-built drawing and spent some time getting the wall schedule correct and how I wanted it.  I then saved and then saved as the new plan.  When I add new walls the schedule that came along from the original file does not update.  I had to go to tools and insert a new schedule and the new walls appeared in the new schedule only.

 

Hopefully there is just one checkbox I am missing, but I am befuddled.

19-1016_RCA_Bldg_I.plan

Share this post


Link to post
Share on other sites

Check the Items To Include section of your schedules.  Those settings don’t properly carry over during a copy/paste and never have as far as I know.  

Share this post


Link to post
Share on other sites
7 minutes ago, Alaskan_Son said:

Check the Items To Include section of your schedules.

Yes, I had done that, did not work...

Share this post


Link to post
Share on other sites
32 minutes ago, wjmdes said:

Yes, I had done that, did not work...

Schedules will display based on "like" information pulled from the column headings that you choose to include..

as in, if you add a column type "floor" you will now get new rows of wall assemblies from a first and second floor regardless of a lack or presence of any other differences between the assemblies.

In your case you have multiple wall types using the description "EXISTING 2X4 STUDS @ 16"O.C., NO GYP BD."

and since you only included the "description" column, CA schedules will not distinguish between different wall types until you add the column type "wall type"

so the new schedule has the column type" wall type" which is why additional wall types are present.

Simply add a wall type column and you will see your schedule populate

Share this post


Link to post
Share on other sites

An experiment to illustrate this would be to add the column "numbers" and watch as you have 35 new rows    

Share this post


Link to post
Share on other sites
7 minutes ago, Renerabbitt said:

Schedules will display based on "like" information pulled from the column headings that you choose to include..

Yes, that fixed it, now I need to figure out how 2 select the walls on both floors at the same so the description matches.  This info would be great if it was in the wall definitions and not for each seperate wall....

Share this post


Link to post
Share on other sites
3 minutes ago, wjmdes said:

Yes, that fixed it, now I need to figure out how 2 select the walls on both floors at the same so the description matches.  This info would be great if it was in the wall definitions and not for each seperate wall....

I typically name my wall type and remove description entirely from schedules, but thats just me

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    27865
    Total Members
    6254
    Most Online
    RichRidgewood
    Newest Member
    RichRidgewood
    Joined