eraser82 Posted September 10, 2014 Share Posted September 10, 2014 I am trying to figure out the right order to building a padio with retaining walls and above ground railings.In have my terrain set to automatic elevation and my ground floor set to -38". Not sure if that was the proper way to set up. Perhaps this is the source of my problems?Thanks for any help! Link to comment Share on other sites More sharing options...
lbuttery Posted September 10, 2014 Share Posted September 10, 2014 Hi: you will probably need to post the plan also provide more info on what you are trying to achieve and what steps you have already done Lew 1 Link to comment Share on other sites More sharing options...
DavidJPotter Posted September 11, 2014 Share Posted September 11, 2014 Do you mean "Patio" ( I never heard of a padio as a name for a space)? Be that is it may, if you need to remove the terrain that is covering your "padio" you can use a terrain feature set as a "hole" to remove the unwanted terrain. Otherwise I agree with Lew that more data is needed as to what, exactly your problem is please. DJP 1 Link to comment Share on other sites More sharing options...
eraser82 Posted September 14, 2014 Author Share Posted September 14, 2014 No, thank you - the hole action was a perfect fix, because the 'padio' is not considered a foundation object the land was not deforming around it, cutting a whole was the perfect solution. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now