Mariobarrett1992 Posted July 24, 2018 Share Posted July 24, 2018 I can't seem to understand how to get the gap between fixed Link to comment Share on other sites More sharing options...
Mariobarrett1992 Posted July 24, 2018 Author Share Posted July 24, 2018 Thank you. the actual plan files or an image? Link to comment Share on other sites More sharing options...
Kbird1 Posted July 24, 2018 Share Posted July 24, 2018 The actual .plan file , just make sure the Plan is NOT open in CA when you attach it as CA locks the File when open and it won't upload. Did you build the framing yet? Please add you software version at a minimum to your Signature as different versions may require different answers Link to comment Share on other sites More sharing options...
Mariobarrett1992 Posted July 24, 2018 Author Share Posted July 24, 2018 My version of Chief is x10 Osx El Capiton Macbook Pro - Intel Core i7, 16GB RAM mameenew.plan Link to comment Share on other sites More sharing options...
robdyck Posted July 24, 2018 Share Posted July 24, 2018 Select the rooms that have the cantilever floor, open the room specification dbx and under the materials tab, change the materials for 'cantilever underside' to 'insulation - air gap'. Link to comment Share on other sites More sharing options...
Kbird1 Posted July 24, 2018 Share Posted July 24, 2018 4 hours ago, Mariobarrett1992 said: My version of Chief is x10 Osx El Capiton Macbook Pro - Intel Core i7, 16GB RAM mameenew.plan It looks like framing the Floor/changing the Floor defaults to Concrete fixed it... do per Rob above to fix the "shimmering material" appearing on the Concrete overhangs, this is autogenerated by CA and would usually be the ceiling Colour.... "no material" doesn't appear to work in this case for the cantilevers but Opening -No Material does... Link to comment Share on other sites More sharing options...
Mariobarrett1992 Posted July 24, 2018 Author Share Posted July 24, 2018 Thanks guys. i did everything, how do i get the air gap covered? Link to comment Share on other sites More sharing options...
Kbird1 Posted July 24, 2018 Share Posted July 24, 2018 23 minutes ago, Mariobarrett1992 said: Thanks guys. i did everything, how do i get the air gap covered? Using the Air Gap just makes the Cantilever Material invisible so you see just concrete ( not sure why your Floor is 2 layer Concrete) when you look up under the Overhangs. M. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now