Door Schedule


QualicoreHomes
 Share

Recommended Posts

I'm not sure of a way to do that directly. It should say double hinged door, but if thats not enough I do have a couple ideas on work arounds:

 

1- Uncheck 'include in schedule' in door spec box. Create a wall way off the the side of the plan. Create a door the size you want and in the framing section make the r.o. the size you want. Then copy and paste so you have 2. Then your schedule will look right. Then get rid of the door label on the plan and use a callout to make it match the schedule.

 

2- Put text over the incorrect label on the schedule so it looks right.

 

I'd be interested to see if there's a way to change the way it talks (for lack of better term) to the schedule directly.