Schedule(S) Floor Callout


mtldesigns
 Share

Recommended Posts

Joe or Michael probably have a Macro for it , but you can also group select the Doors on each level , Open the DBX and Use the Code Properties Box to report to the schedule the Floor Level .  eg type in BASEMENT  , then Rename the Code Box to Floor Level and make sure the code (Floor Level) column is visible in the Schedule.

 

 

Capture63.JPG

Capture64.JPG

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share