mtldesigns Posted December 3, 2017 Share Posted December 3, 2017 Hey CA users... and pros. A quickie... I couldn't find how to change the floor "0" on all the schedules to say "Basement". Is this a macro thing? As always, thanks Link to comment Share on other sites More sharing options...
Kbird1 Posted December 3, 2017 Share Posted December 3, 2017 Joe or Michael probably have a Macro for it , but you can also group select the Doors on each level , Open the DBX and Use the Code Properties Box to report to the schedule the Floor Level . eg type in BASEMENT , then Rename the Code Box to Floor Level and make sure the code (Floor Level) column is visible in the Schedule. Link to comment Share on other sites More sharing options...
mtldesigns Posted December 3, 2017 Author Share Posted December 3, 2017 Great Idea Mick... why didn't I think of that? :-) Thanks... moving on with this. Link to comment Share on other sites More sharing options...