GeneDavis

Reversing plan and its layout - best practice suggestions?

Recommended Posts

I need to reverse a job for which all is done including the layout (construction documents.)

 

Reversing the plan is straightforward.  All on, edit all areas, reverse.  Done.  Save as original name, REVERSED.  Or something.

 

But what is best done in getting the new layout all done right?  I know, for example, that all the doors are reversed and the schedules need to be regenerated.

 

What do you do?

Share this post


Link to post
Share on other sites

Good topic for DSH 20 MINUTE WORKSHOP

  • Upvote 1

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    27448
    Total Members
    6254
    Most Online
    dan_heidel
    Newest Member
    dan_heidel
    Joined