GeneDavis Posted May 3, 2017 Share Posted May 3, 2017 I need to reverse a job for which all is done including the layout (construction documents.) Reversing the plan is straightforward. All on, edit all areas, reverse. Done. Save as original name, REVERSED. Or something. But what is best done in getting the new layout all done right? I know, for example, that all the doors are reversed and the schedules need to be regenerated. What do you do? Link to comment Share on other sites More sharing options...
dshall Posted May 4, 2017 Share Posted May 4, 2017 Good topic for DSH 20 MINUTE WORKSHOP 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now