DianeP Posted February 21, 2017 Share Posted February 21, 2017 Any way to do this without creating 2 plan and layout files? To add a twist, the client wants to have front loading and side loading garage options. How would you approach this in Chief Architect? Link to comment Share on other sites More sharing options...
Joe_Carrick Posted February 21, 2017 Share Posted February 21, 2017 Yes, it can be done with one Layout and 2 or more Plan Files. Then you will need to segregate the pages to be printed. IMO you will find it's just easier to copy your entire project to another folder and rename/relink. Then make the Plan modifications. 1 Link to comment Share on other sites More sharing options...
DianeP Posted February 22, 2017 Author Share Posted February 22, 2017 Thanks Joe. This helped me get started. I also was able to use Edit Area to select the home inside of the cameras and reflect the home about its center point. This way the elevation cameras still had the correct view.... something that gets messed up when you use the tool reverse plan. Thinking about putting the side loading on the same plan if the garage is on the same side of the home. Then placing 4 more cameras around it to do new elevations to send to the new layout page for side entry plans. The homes would have to be directly in line or the camera from the first house would pick up the second house, I believe. Think this could work? Link to comment Share on other sites More sharing options...
Joe_Carrick Posted February 22, 2017 Share Posted February 22, 2017 You can use the "Back Clipped Cross Section" to do the Elevations without seeing the adjacent houses. 1 Link to comment Share on other sites More sharing options...
DianeP Posted February 23, 2017 Author Share Posted February 23, 2017 Good idea! I hadn't thought of that, Thanks. in this case I could do all versions that need monolithic foundations on one plan and all versions that need block on a different plan. Then send the views to the corresponding layout plan. This would make it easier to make the inevitable changes as my production builder finds something he missed on the plan. They would all be in one or two locations. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now