Thank you! I will discuss that with him the next time we speak.
-
Wow! And I thought Seminole County, FL was strict. LOL!
-
Thank you! I will ask the owner if he wants to do that. There's also a concern that there might be some ledge about 2' - 6' down so that might be a good next step. He has mentioned that the builder can put any foundation on it that he wants. I don't know if the building department would require another set of plans to issue another permit for a different type of foundation. When I spoke to them on the phone, they seemed more concerned with making sure the setbacks were honored. I've lived in a small community where the criteria for getting a permit were much less stringent than where I grew up in, just north of Orlando.
-
Thank you! I don't have access to those tools. Or should I say, I don't want to pay for them at this time.
-
Thank you so much for your detailed critique! I grew up in Seminole County, just north of Orlando, FL and just recently moved to Portugal. I "arrived" 9 months before the mouse. My father was an electrical contractor and did a lot of work in and around the greater Orlando area when it first began to grow rapidly. I will update my wording for the framing dimensions. I knew that using the word "layer" was not appropriate and couldn't think of a better term. Yeah, "undimensioned" is not a word. Again, I couldn't think of any other way to say what I was trying to convey. I will definitely take your advice and try to reword that better. Muito obrigada! Regarding dimensions on sheet 4. Yes, I did notice that, too, and I should've corrected that. The home was designed from the inside out, which should explain why the dimensions are so weird. I will correct all of that. Yes, I planned on using rafters since there was a lot of attic space that could be potentially used as storage. Thank you for the catch on sheet 7. I had a hard time having Chief measure to the same elevation from one elevation view to the next. I'm wanting to indicate the sub floor for each level and the top of place for each level and it just couldn't seem to find those! Very frustrating. I must be doing something wrong, but I'm not sure what. Sheet 10: Thank you for that! The owner has much less experience with construction than I do, not that I have any great amount of knowledge. The owner is trying to save costs and I'm not sure what the construction company is going to use. If it were me, I would go with the I-joists. So I will spec those. Thank you, again! Sheet 7: I believe this must've been an automatic setting in Chief and I just went with it. However, I should've checked the code or some other resource to see if a smaller rafter could've been used. They definitely don't have to worry about snow load in that location. I spent 16 years in the mountains of Maine, and that was definitely a consideration. Thank you for the stair cut calculator results. Did I do something wrong on my stairs? I thought I had stayed with the min/max for tread and riser... Thank you, again, sir for your critique! Lisa Tenha um bom dia!!!
-
I looked up the soil type for this location and it is considered silty and clay-ish. I when I looked up the soil type in the code for footing size this is where it fell in the table. Yeah, I thought the same thing. Big chunky footing! But I figured it was needed since it appears the soil will give way fairly easily. However, after I made all of the drawings I did some more research about possible ledge in the area and that seems to be a concern also. Apparently, it can appear anywhere from 2' - 6' below the soil surface. If ledge is found, then the owner will have to decide if he wants to excavate or make the basement much smaller. Or I guess, move the house further back because the lot does slope down 10' about half way back from the road. Thank you!
-
Thank you! Yes, I did include way more information than is required by this particular building department. But I wanted this to be practice for if I ever get a client in a stricter jurisdiction. I lived in Seminole County, FL and they require all of their submitted plans to be architect or engineer stamped. I'm glad not all jurisdictions are like that. I'm not using trusses. It's all going to be rafters for the roof. Yeah, about 7-8. I wasn't sure how to separate those without having another section camera. 7 is for the roof and 8 is for the floor.
-
Yes, this is a practice run. I thought I did include at least some structural.... I showed the foundation and footings, etc. What else am I missing???? Thank you so much!
-
How did you get that?
-
Hello, I'm sorry if I am posting this in the wrong category, but I honestly couldn't decide where the best place for this was. I am seeking a constructive critique of this set of drawings. This is for my very first client and while this municipality does not require this much detail, I wanted to include it just in case. I'm hoping to receive a general critique of the overall work I drafted. Is there anything substantial that I'm missing? Should I really include a Roof Framing page? Is there anything glaringly wrong with my construction details? Are there details that I should've included? The client will be picking out the specific materials when the time comes. However, the client has definitely decided he wants a full brick veneer and the brick soldier courses over the windows. I appreciate any time anyone could devote to this, Lisa M. Fida Timber Bay Home Design Anita III - Basement - Reversed.pdf
-
Stair Rise and Run Information on Plans
OneChickNoHammer replied to ValleyGuy's topic in General Q & A
Seminole and Orange Counties in Florida are pretty picky, too! -
Stair Rise and Run Information on Plans
OneChickNoHammer replied to ValleyGuy's topic in General Q & A
I will try the "complete break" next time and the %total_riser% function. Is there a reference guide to all of the macro functions that are available? If so, where can I find it? Thank you, DB! PS - Keep moving.... you'll be harder to find.... -
Stair Rise and Run Information on Plans
OneChickNoHammer replied to ValleyGuy's topic in General Q & A
Thanks, Joe! I'll consider your system when I'm doing more work. Right now I'm just a hobbyist. Lisa -
Stair Rise and Run Information on Plans
OneChickNoHammer replied to ValleyGuy's topic in General Q & A
I think I figured out what I can do to make this work. I can do separate macros for each stair section then make another macro that puts the other macros together. I night's sleep and it came to me. Hope this helps out others. I also figured out how to change the stair section width. I missed the step once you "break line" the stair you have to "Disconnect Selected Subsection". -
Stair Rise and Run Information on Plans
OneChickNoHammer replied to ValleyGuy's topic in General Q & A
Hello Doug, I'm hoping you can clarify how to use the stair section method you mentioned. I've attached some screen shots to help explain what I'm trying to accomplish. I have manually drawn 2 different stair sections and moved them to where they are touching at their meeting point. I made sure that the heights are correct so they look correct in a 3D view. However, when I try to do the Text Macro for the stair information I only get the section that the arrow is attached to. I tried your method to identify a section and still only get the info related to the section that the arrow is attached to. I've done Excel macros, VBA, VB, and Arduino coding so I'm fairly familiar with what most of the code means. Is your section variable user defined? You mentioned "global" but I can't seem to find it anywhere in the program macro options when I try to create a new Text Macro. I drew the stair sections manually because I wanted the first 4 treads to be wider to accept the railing and for the railing to dead end into the wall. I thought their was a way to "break line" a stair to widen part of it in Chief from a regular straight stair but I wasn't able to figure it out. I used the macro to take the 4 risers it recognizes and added 11 in the macro to get the 15 that you see in the Text Box. Thank you for any assistance you can provide. Lisa M. Fida