Yes. I pulled this Simpson LU28 from the 3D Warehouse and placed it in the plan. It shows under Fixtues by default, but that can be changed.

post-70-0-06340200-1455117230_thumb.jpg

post-70-0-91253400-1455117239_thumb.png

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    27825
    Total Members
    6254
    Most Online
    ChiefDallas
    Newest Member
    ChiefDallas
    Joined
  • Similar Content

    • By tswitos
      Community,
       
      I have been watching a lot of Chief training videos on how to make walls, foundations, and floor joists, and I am trying to figure out a way to integrate joist hangers into the ICF wall to connect the floor joists.  In the real world, the footer is poured first, then the ICF wall erected, reinforced, joist hangers inserted, and braced, then concrete poured into the ICF wall.  The ICF wall will start on the footer and rise all the way up to the ceiling of the room, (and this will include the encapsulated crawl space), for example, 13 feet high.  And the joist hangers will be, for example, 3 feet above the footer.  Can Chief do this?  Thanks in advance.
       
      I have inserted an example of an ICF with a floor joist attached.
       

       
      I found this image from an older post, and it shows one type of hanger that comes with Chief (ICF wall ledger at floor), but that is not in my library.
       

    • By Renerabbitt
      LSU28 hanger scaled off of the CAD specs in the simpson Calibz. file