Video Lesson - Roofs


SNestor
 Share

Recommended Posts

On 3/8/2024 at 2:20 PM, solver said:

What about using a 2nd floor Open Below room? Walls to control the roof go there and you may leave auto rebuild on. The highlighted wall can be deleted prior to building framing for the last time.

 

712317566_ct1.thumb.PNG.8ae7bd3340a05f7742057eefc2342c68.PNG

Eric - adding a 2nd floor of course works. But - you have to account for the floor thickness. If you don't...and you spec 24"...what you will get is the floor thickness plus the 24". 

 

For my simple example...transform/replicate to lift the roof was/is very fast...and accurate. :)

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share