Doug_N Posted May 22, 2023 Share Posted May 22, 2023 Ok, so the reason for the post was to learn about how to detail wall assemblies where external strapping is required and for some reason including instruction for where the strapping goes is a good idea so that there is no mistake about where things go. If the strapping is vertical, then here are the settings so that the strapping starts at the top of the stem wall. For vertical strapping it seems the default is to start at the top of the stem wall. See the DBX below For horizontal strapping the bottom strap must be specified as the same as the floor thickness. the program automatically starts at the reference floor level (zero absolute) and not the top of the stem wall. Link to comment Share on other sites More sharing options...
Renerabbitt Posted August 15, 2023 Share Posted August 15, 2023 @Doug_N Throw this in the Tips and Tricks Forum Link to comment Share on other sites More sharing options...
Doug_N Posted August 15, 2023 Author Share Posted August 15, 2023 Hi Rene, I posted a link to this topic in Tips and Tricks. Doug Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now