Skip_D Posted April 2, 2023 Share Posted April 2, 2023 Good Evening, I am moving an existing building on a lot. I have fully developed the existing terrain (it's slopes), and have also fully developed the existing structure. The project now involves literally picking up structure and relocating it on the lot. QUESTION - is it better to selected the structure and move it on the lot (like we do in real life), or am i better off shifting the terrain under the building. For this exercise I've done it both ways, and while both are easy tasks and seem to work without issue, I am getting slightly different results in how the slope lot 'hits' the building. The 'Subfloor above terrain' dimension isn't changing in the dialogue box. Any thoughts? thanks, Skip X14 Link to comment Share on other sites More sharing options...
rgardner Posted April 2, 2023 Share Posted April 2, 2023 3 hours ago, Skip_D said: Good Evening, I am moving an existing building on a lot. I have fully developed the existing terrain (it's slopes), and have also fully developed the existing structure. The project now involves literally picking up structure and relocating it on the lot. QUESTION - is it better to selected the structure and move it on the lot (like we do in real life), or am i better off shifting the terrain under the building. For this exercise I've done it both ways, and while both are easy tasks and seem to work without issue, I am getting slightly different results in how the slope lot 'hits' the building. The 'Subfloor above terrain' dimension isn't changing in the dialogue box. Any thoughts? thanks, Skip X14 Never move the building always the terrain. 3 Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now