Want to change a window number in schedule


Recommended Posts

Hello all,

 

I have a situation where I have three very similar windows. They are the exact same size and overall construction, a double transom window over a double window. The differences in the windows is one window the bottom double window is op/fixed, the next window is fixed/op and the last window is fixed/fixed. The problem I am having is they are all showing up as the same window in the schedule, in this case are all listed as W20. Is there a way I can change the window numbers?

 

Thanks for any help.

Link to post
Share on other sites

Thanks,

 

While that does work for me the only drawback is it then applies different number s for every window even if they are identical. Just wondering if there is a way to manually renumber a window.

Link to post
Share on other sites
25 minutes ago, myrtsbnye said:

the only drawback is it then applies different number s for every window

 

Somehow I expected that response :)

 

Could you post a simple plan with the 3 windows. I have an idea that would be easy to test using your windows.

Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
  • Member Statistics

    29613
    Total Members
    9156
    Most Online
    Pav-Arch
    Newest Member
    Pav-Arch
    Joined