Want to change a window number in schedule


myrtsbnye
 Share

Recommended Posts

Hello all,

 

I have a situation where I have three very similar windows. They are the exact same size and overall construction, a double transom window over a double window. The differences in the windows is one window the bottom double window is op/fixed, the next window is fixed/op and the last window is fixed/fixed. The problem I am having is they are all showing up as the same window in the schedule, in this case are all listed as W20. Is there a way I can change the window numbers?

 

Thanks for any help.

Link to comment
Share on other sites

25 minutes ago, myrtsbnye said:

the only drawback is it then applies different number s for every window

 

Somehow I expected that response :)

 

Could you post a simple plan with the 3 windows. I have an idea that would be easy to test using your windows.

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share

  • Member Statistics

    30205
    Total Members
    9156
    Most Online
    emmabrownnn
    Newest Member
    emmabrownnn
    Joined