Sign in to follow this  
DianeP

schedule lables and door and window lables

Recommended Posts

Working in CA x10.  Can you have both the schedule symbol label for the window or door and its regular label display on the plan?

 

 

window label.JPG

Share this post


Link to post
Share on other sites

Don't know what happened  to the responses from Eric and Joe(?)   They disappeared. 

 

Share this post


Link to post
Share on other sites

Ok

Image one is how to get what you asked Schedule and automatic label, OOB

Image two is mine with macro and font modified help from Joe and Michael

Image three is how my plans look with a schedule.

If no schedule then it will only show everything with out callout. (No "D06" or "W03" in image)

 

Note I have egress as last label line. It shows only if egress is checked in that window. 

 

Edited last image as it was a custom mulled unit. sorry now shows standard door and window

Image3.jpg

Image2.jpg

 

Image4.jpg

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
Sign in to follow this  

  • Member Statistics

    27475
    Total Members
    6254
    Most Online
    slickrick1530
    Newest Member
    slickrick1530
    Joined