olyconstruction Posted November 18, 2016 Share Posted November 18, 2016 Hi Chiefs, I have attached the plan I am working on. If you look at the schedule on the first page you will see door 1 which is 39 1/2" wide I think. My problem is that I can not find it anywhere in my plan file!! Does anyone out there know how I would find it? Can anyone out there find it? I should probably know where it is considering I drew the darn thing but for the life of me I can not figure out where it is!! The other problem is that the windows are not numbered sequentially in the schedule, particularly the window schedule. How do I get them to show in numerical order and additionally what might be causeing them to show this way in the first place. Please let me know what you think! Thank you! AB BILEADOU_-_PROPOSED-_VERSION_3-_11-8-16.plan Link to comment Share on other sites More sharing options...
ShaneK Posted November 18, 2016 Share Posted November 18, 2016 Renumber a schedule by selecting and hitting icon I circled. As for phantom window, I deleted schedule and opened a nw one and bad window went away. 2 Link to comment Share on other sites More sharing options...
olyconstruction Posted November 18, 2016 Author Share Posted November 18, 2016 Thanks Shane! That did fix my window schedule problem but not phantom door. You said window in your post, did you mean the door? When I went and made a new schedule the door is still there somewhere? Link to comment Share on other sites More sharing options...
Chief16Designer Posted November 18, 2016 Share Posted November 18, 2016 6 minutes ago, ShaneK said: Renumber a schedule by selecting and hitting icon I circled. As for phantom window, I deleted schedule and opened a nw one and bad window went away. I have to give you a point i learned a couple of things from you thank you Link to comment Share on other sites More sharing options...
olyconstruction Posted November 18, 2016 Author Share Posted November 18, 2016 By the way I just made a cad block from the schedule and deleted the bad door. All is well! Thanks again! Link to comment Share on other sites More sharing options...
ShaneK Posted November 18, 2016 Share Posted November 18, 2016 Alex your door #1 in the new schedule after deleting problem schedule is the pocket door. When you renumber it changes all door number sequence. 1 Link to comment Share on other sites More sharing options...