chief58

Members
  • Posts

    1007
  • Joined

  • Last visited

Posts posted by chief58

  1. 8 minutes ago, Alaskan_Son said:

    They're going onto your " DEFAULT CAD LAYER".  Just turn that layer on.

    Thanks Michael, I turned on all my layers and it was a mess next time I should do one at a time, as usual thank you much for your help much appreciated

  2. I did a plot plan in a cad detail window (Costanzo plot plan) with all the corodances provided, see detail, when I try to bring in a plan footprint by selecting the cad, and then plan footprint I select first floor and nothing shows up anyone else have this problem, I am attaching the plan

    COSTANZO FINALS.zip

  3. 9 minutes ago, ChiefChris1 said:

    Oh...gees...
    I found it.

    I have to check "other" to include the blocks in the schedule. 

    There's an hour I'll never get back

    Just think Chris there is also an hour you will never lose again for something like that

     

  4. 1 hour ago, mrscott said:

    I could go on but I will leave you with this. When Chief gets the Stair Tool to a professional level of capability and does away with rooms that drive practically everything and moves to Story for levels for defining elevations, and does away with the separate LAYOUT and puts everything in one file like REVIT, ARCHICAD, VECTORWORKS, to name a few, then I can honestly support Chief as a Professional Architectural Design Software. 

     

    P.S. I am more than happy to speak with anyone wishing to know more but not here. I am only trying to encourage Chief as a Company....Come on guys you're so close and believe you can do it.

    Pretty pictures, Elaborate libraries are nothing more than putting a very $5000 paint job on a dirt track bumper car. To the professional, this adds ZERO value when I need a solid can do it all software package to produce CONDOCs. The paint job is secondary.

    Scott I agree I wish Chief would concentrate on revamping the stair and railing tools, and concentrate on producing construction documents since without accurate condoc there is no accurate pretty pictures like putting a house on the ground without any foundation

    • Like 1
    • Upvote 1
  5. Steve if you go under the layer and whichever layer display option at the bottom of the layer display option you can change the text style to the type and size you want that will change everything on that layer to the style and size I think that is what you are asking

  6. 7 hours ago, Richard_Morrison said:

    While I think it is admirable to try to make things as clear as possible to a door supplier, it is also possible to take on unwarranted liability in doing so. If you give them a door schedule with simple door types, sizes, and hardware groups,  PLUS the floor plan, then they are responsible for determining the correct handing of the door, etc. This is what they do for a living. There will still be screw-ups, of course, but at least they won't be yours or Chief's.  

    I agree with Richard let the floor plan show the swing and let the contractor order the door with the hinges and knobs on the way they do it in their county or area

  7. 17 hours ago, Jay_on_Cape said:

    You good Ray?  I do a lot of plans with I-joist floor joists.  Any other questions let us know.

    yes thanks for checking Jay found where I had to change the numbers at