chief58

Members
  • Posts

    1007
  • Joined

  • Last visited

Posts posted by chief58

  1. if you know the existing roof line height that you have drawn copy it and if you want the fascia's to match lock the fascia heght or lock the baseline height on the one you want to match then paste the new ridge height, it will change the pitch and match the ridge heights

  2. Ray-

    any clue as to what they offered to help remedy this?

    no I forgot that is why I suggested to call tech, I am not tech savy, I had to copy the user lib that is in the my document folder and paste it back in but not sure where

     

    sorry I can't help more

  3. If you go into door defaults under framing you can specify the r.o. for each side, and top, they when you set your defaults for your door schedule add the r.o. to your schedule and they will show, if you get a door that is different just set it in that door dbx

  4. J

     

    I was allowed to download a beta version. Don't they offer a Beta test version to all regular subscribers?  

    Joey Chief usually does just before the final release but the program has been beta test by other members before it is offered to SSA subscribers

  5. Graeme I understand that I was putting out there that if they were looking for a tester to test before V8 comes out to see how things were going I was will to help out since I have sent many request in, always willing to help improve the program even if they wanted to do some test between.

  6. Perry doing a set of simple steps to the second floor steps are 42" wide and cover the wall below which has steps to the basement and they are jumping all over the place and a simple straight set of steps that should be nothing to do and I have to keep moving them back into position, very time consuming, Chief please fix fix the steps and railings 

    • Upvote 1