  1. Importing dwg into CA and find the dimensions are not in one line. (see below) Which option can i use to fix this. The file is from Archicad exported as dwg.
  2. Thanks Glen, Yes i realised that. Lastly i cannot continue the stairs up the building. I coppied and pasted (hold position) up a floor though doesnt seem to go up to that floor always goes to bottom floor, any suggestions?
  3. Bit of perseverance and i got it. How do i bring the floor over to connect to the stairs? I made a room polyline to connect the floor to stairs but not sticking. Any suggestions?
  4. Im not able to connect the stairs with correct amount of treads.
  5. Hi Glen, Thanks. How do i create stairs like this below?
  6. How to remove balustrade around top of stairwell and place custom upright timber
  7. Glenn, I used the U stairs and changed the winders to 6 treads and locked them.
  8. Thanks Glenn, and everyone else. All sorted. Cheers.
  9. This is he Stair Layout. Glenn i messaged you my number. The 6 winders Finish to a point, as shown above.
  10. I place the U stairs and cannot change to 6 winders
  11. Having trouble with the 6 winders.
  12. Cannot find out how to create these stairs.
  13. Cannot find the live material view. Only seen in the video though, no where else.
  14. Small problem with a model. The job has demo walls which have been drawn on a demo layer set. All works well though when i change to new layout layer set you can see where the demo walls are located as it cuts through the tiles floor finish. Dont know how to fix this.
  15. The first Schedule Number is 1 and then you need to place the proceeding number from the last number of the previous schedule. level 1 D1 to D6 level 2 the Schedule Number has to start D7.
  16. Hi Glenn It is set to 1, maybe i should remove the 1
  17. I have a multi story house and the door schedule are seperate for each floor. Every time i add a new door schedule the door number start from D1 every time. In the schedule the floor number changes though how can i get the doors to dispay in a consectutive numbers e.g. D1 to D40
  18. I think this is what you want. What you asking does not work. The door has to finish flush with the inside otherwise the door will bind when you open the door on the inside edge.
  19. Thanks Mark I found the issue with the wall under the dormers. I was placing the dormers first then the wall. When I placed the wall first and then the dormer it worked perfectly.