Jambruins Posted 1 hour ago Share Posted 1 hour ago I have a sloped site and I am trying to get a door with retaining walls on each side of the door. I have a terrain line with elevation 0 at the high side of the house, an elevation line with elevation -72 at the low side of the house and an elevation line with an elevation -48 in the middle of the house. This may not be the correct way to start so please let me know if I should be using a different method. How do I get the grade to be flat and at the bottom of the foundation (-72 elevation) between the retaining walls for the door? Thanks for the help. Link to comment Share on other sites More sharing options...
Chrisb222 Posted 22 minutes ago Share Posted 22 minutes ago (edited) 1 hour ago, Jambruins said: How do I get the grade to be flat and at the bottom of the foundation Try an Elevation Region: Terrain > Elevation Data > Elevation Region Edited 21 minutes ago by Chrisb222 Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now