KnotSquare Posted April 10 Share Posted April 10 I have a house nearly complete and a bit of a complex framing system with plenty of custom and individual members. I realize I will have to redraw each floor truss as when I framed it automatically before it did not do as I planned in the design; by a lot. There are interior cantilevers it could not figure out and some curved framing on that interior balcony. What I cannot find information on is how I can raise up the entire second level without screwing up my custom roof framing. Once I have increased the distance between Level 1 and Level 1 to 18" from 12", I need to work out stairs, etc. The same will occur from Basement to Level 1, but only an increase of 2 inches, so I will likely lower the Basement slab and then thicken the floor. Any ideas on how this can be accomplished without an entire rebuild? I could use tips for both levels if anyone has any as I am just going to experiment at this point. I don't think I can take the entire roof framing system and turn it into a symbol and then unblock it up 6 inches, but that is where I am going to start while I see if anyone has any ideas. It seems Chief is somewhat particular on what can be turned into symbols. SaveAs,SaveAs, SaveAs. Thanks ChiefTalk, Mark Link to comment Share on other sites More sharing options...
GeneDavis Posted April 11 Share Posted April 11 Try locking layers before you start editing. Link to comment Share on other sites More sharing options...
KnotSquare Posted April 11 Author Share Posted April 11 Great idea Gene. Thank you. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now