divreig Posted October 26, 2021 Share Posted October 26, 2021 Easily by bypassed but still wanted to know if I was doing something wrong or is this a bug in CA. I was about to build the framing for a wall with 24oc studs, normally I just uncheck use wall framing material in the farming dialog and change the spacing. But thought I should try adjusting the wall itself because that would be useful for other projects that might have different stud spacing in different walls. So opened the wall and seams that stud spacing is controlled by the plan materials. Copied the existing fur stud material and changed its name and the spacing. but when i go back the framing dialog it still has stud spacing at 16oc. I want to know if i am doing some incorrectly? exisitng.plan Link to comment Share on other sites More sharing options...
robdyck Posted October 26, 2021 Share Posted October 26, 2021 Notice in your last snippet that the stud spacing field is greyed out. This means that the spacing is being determined by the Main Layer (the material as shown in your 1st and 2nd pic). Link to comment Share on other sites More sharing options...
divreig Posted October 26, 2021 Author Share Posted October 26, 2021 yes but when build it its still at 16OC should it not change in the grayed number as well? Link to comment Share on other sites More sharing options...
robdyck Posted October 26, 2021 Share Posted October 26, 2021 19 minutes ago, divreig said: yes but when build it its still at 16OC should it not change in the grayed number as well? Nope. It is simply a setting to override the Main Layer material option. You can manually change it to any value you choose. It is not a report. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now