brianhf Posted June 11, 2020 Share Posted June 11, 2020 I am having a problem with door labels. I have "include schedule number" checked on the door settings, and I have "include schedule number" for the label set in the Schedule, but I am getting odd labels that do not make sense -such as D18, D16 - 3068. File would not upload, so here is Onedrive link. Thanks, Brian. https://1drv.ms/u/s!ApLoJtsNFkLMgrN9XfUXzWHo-HljFA?e=ZyJ83w Link to comment Share on other sites More sharing options...
Chopsaw Posted June 11, 2020 Share Posted June 11, 2020 You have 2 Door Schedules. 1 on level one and 1 on level two. If you want it to be that way make each schedule specific to it's floor level otherwise delete one of them. The other option is the convert one of the schedules to Text once you are sure there will be no more revisions. Link to comment Share on other sites More sharing options...
brianhf Posted June 12, 2020 Author Share Posted June 12, 2020 I figured out my problem. I had two door schedules (hence the two door numbers), but each schedule had different features, such as room name, which resulted in different door numbers. Link to comment Share on other sites More sharing options...
brianhf Posted June 12, 2020 Author Share Posted June 12, 2020 Chopsaw, Thank you very much for your reply. Best wishes. Brian. 1 Link to comment Share on other sites More sharing options...
Chopsaw Posted June 12, 2020 Share Posted June 12, 2020 You are quite welcome Brian. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now