Do you need a takeoffs or an estimate. Chief architect generates a take offs but if you need an estimate ask your foundation contractor.

Produced by CA:

FO1        0                1/2x6"    foam sill seal    353 ft
FO2        0                foundation bolts    96
FO3        0                8" thick    Concrete    51.08 cu yd
FO4        0                no. 4    horiz. rebar (wall)    4482 ft
FO5        0                no. 4    vert. rebar (wall)    2069 ft
FO6        0                16" thick    concrete footing - concrete    11.46 cu yd
FO7        0                no. 4    rebar (footing)    764 ft
FO8        0                12" thick    post footing - concrete    0.42 cu yd
FO9        0                no. 5    rebar (footing)    13 ft
FO10        0               4" thick    concrete slab - concrete    30.50 cu yd
FO11        0               steel mesh for slab    2470.13 sq ft

+++++++++++++++++

Now You need to add 6mil poly, a "gravel" [#6,#8#67] or sand or * rock 4" - 6"

Add excavation...

Link to comment
Share on other sites

13 hours ago, BrownTiger said:

Do you need a takeoffs or an estimate. Chief architect generates a take offs but if you need an estimate ask your foundation contractor.

Produced by CA:

FO1        0                1/2x6"    foam sill seal    353 ft
FO2        0                foundation bolts    96
FO3        0                8" thick    Concrete    51.08 cu yd
FO4        0                no. 4    horiz. rebar (wall)    4482 ft
FO5        0                no. 4    vert. rebar (wall)    2069 ft
FO6        0                16" thick    concrete footing - concrete    11.46 cu yd
FO7        0                no. 4    rebar (footing)    764 ft
FO8        0                12" thick    post footing - concrete    0.42 cu yd
FO9        0                no. 5    rebar (footing)    13 ft
FO10        0               4" thick    concrete slab - concrete    30.50 cu yd
FO11        0               steel mesh for slab    2470.13 sq ft

+++++++++++++++++

Now You need to add 6mil poly, a "gravel" [#6,#8#67] or sand or * rock 4" - 6"

Add excavation...

  And from there export into MS Excel and add & revise anything you need to ...
Chief's takeoffs are pretty accurate and once set up properly can be a great tool ... 

214289451_estimatesample.thumb.jpg.c92832656106e9694cee7d45f1d0ba42.jpg

 

 

image.png

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share