MarkMc Posted August 1, 2015 Share Posted August 1, 2015 I saw someone asking for Hafele items. While I use lots of RAS and Hafele items in designs I rarely place them in the plan since. Now if I could get them into the schedule under the correct cabinets that is another story. I got these by placing freestanding in 2020 and export to CAD. I didn't bother to mess with the materials on them. Library has Hafele Lemans closed and the same open, along with a Rev-A-Shelf chrome tray divider set at 5 1/2" off the floor. Placing them requires ctrl key override. To show the lemans change cabinet door to opening and place a loose door. You still have to get hold of the specs to check clearances and fit these are NOT automatic. Link to comment Share on other sites More sharing options...
Cheryl_C_Crane Posted August 1, 2015 Share Posted August 1, 2015 Thanks, Mark! Link to comment Share on other sites More sharing options...
rwaldrondesigns Posted February 16, 2020 Share Posted February 16, 2020 Hey Mark- how are you getting around the schedule challenge? Code? Comments? I'm trying to figure out the best way to do this- it seems pointless to put it in if it doesn't show up in the schedule. Link to comment Share on other sites More sharing options...
MarkMc Posted February 17, 2020 Author Share Posted February 17, 2020 18 hours ago, rwaldrondesigns said: Hey Mark- how are you getting around the schedule challenge? Code? Comments? I'm trying to figure out the best way to do this- it seems pointless to put it in if it doesn't show up in the schedule. Depends on which schedule, best asked in Q &A with specific Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now