site grading plan


TCB_BdnMY
 Share

Recommended Posts

Well I'm sure this is easy and I'm missing something simple like usual, but these darn things stump me every single time. 

 

The red line is the cities required finished grading.

need 1' from grade to T/O ICF anywhere. 

Driveway needs to stay under 4% slope

 

How would a guy go about adjusting this so it meets requirements for the grading while maintaining the lower slop on the driveway? 
My first thought is to keep the grade beam of the garage where it is, then raise the basement / main floor to meet the grading criteria?

Thoughts? suggestions?

I cant be the only person who just... cant... wrap my head around this, right?

 

image.thumb.png.de21ded67c9cb0c913725f3a32dfd6a0.png

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share