Double stud pony wall + stem wall transition question for a walk-out basement in Zone 7A.


jgolden
 Share

Recommended Posts

I'm trying to figure out how to properly construct a 3 section pony wall in Chief on a stepped foundation.

 

ICF stem wall to slab (purple)

ICF with 2x4 + 2x3 furred wall (yelllow) (hasn't been defined)

double stud wall, 2x6 -> 2x4 -> 2x3 (orange)

yelllow and orange are floor 0

green is floor 1

Cheers!

Double stud wall:

image.thumb.png.8506c00f8f1c10b45906345219e6321e.png 

 

image.thumb.png.ff3193839d97eb0f029e6c903ce583b9.png  image.thumb.png.a677224506a1e029a28db9404c3a21f3.png

 

image.thumb.png.8163a1379cded771b6e93cd1eef147a1.png

 

 

Edited by jgolden
Link to comment
Share on other sites

2 hours ago, jgolden said:

ICF stem wall to slab (purple)

ICF with 2x4 + 2x3 furred wall (yelllow) (hasn't been defined)

double stud wall, 2x6 -> 2x4 -> 2x3 (orange)

This is a membership only video. I changed it to public for this thread but will change it back to membership after today. give it a watch, it explains a very simple process for this:

 

Link to comment
Share on other sites

39 minutes ago, jgolden said:

My basement is on floor 0

put it on floor 1 and it will make this process a lot easier and more dynamic, that way your stepping happens above your FF and makes use of a stem wall pony wall and your furring wall

 

Link to comment
Share on other sites

Derp!  That finally clicked.  Is there another way to modify my plan other than inserting a new floor above floor 0 then manipulating the terrain Surface at contour?  If not, it's going to be a bit of an effort to shift all manually modified roof, framing, etc. 

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share