Schedule linked Callout location not movable in plan view


KKBKeith
 Share

Recommended Posts

Hi All, I created schedules as separate cad details for all my various fixture types & saved a plan view with layer set just for identifying them all on one dedicated sheet in Layout. A couple of issues have come up that I can't find a way to fix/modify. On most of the fixtures I moved the callout symbol around on the plan for clarity, but some of them have been locked in those locations & the ability to change them disable. In the pic below I have a lavatory callout that was moved temporarily to get it out of the way of others but it is now stuck where I moved it. Is there anything to get that editability back? I've tried deleting the vanity and adding a new one & but it still places the callout in the same place. Thanks.

 

75098562_Calloutsymbolplacement.thumb.jpg.867b89bc59c30e3479bcc8e951d1be0f.jpg

P01 is the lavatory callout that I can no longer move around.

Link to comment
Share on other sites

That sounds like a layer that is locked. But you've probably checked that. It may be a good idea to post the plan for this one. If you don't want to post it here, you can share a link with me by using a personal message. I'll take a look and try to help.

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share