Wrong Rough Openings In Window Schedules?


DB-Designs
 Share

Recommended Posts

Hello Everybody! I'm using CA Premier X6 and I adjusting everything I needed to in the defaults for my window schedule. When I bring the window schedule into the drawing, it's showing wrong rough openings as compared to the size of the window. For an example: I have a 28"x28" fixed window in the schedule but the rough opening calls out 40"x28 3/4". Any ideas of why this is happening? Thanks for the help!

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share