GeneDavis Posted September 10, 2020 Share Posted September 10, 2020 I have the foundation wall as a two-layer thing, 8" main layer concrete, the finish outer layer in 2" air gap and 4" stone. I want the framed wall above to have the stone come up to level 0 (with its stone wall cap done with a molding). So is this best done with material regions for the stone? Or am I better off using a stacked molding, stone under stone cap? Link to comment Share on other sites More sharing options...
GeneDavis Posted September 10, 2020 Author Share Posted September 10, 2020 Yes! That's it. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now