Need to go through the Rescheck thing for the latest, and wondering before I start, how accurate the Material List General section is with its thermal envelope numbers.

 

Do any of you use the walls, window, and doors numbers straight from Chief?

 

Interestingly, Chief gives me no figures for floor 0 of this project, one with  walkout basement with much of the exterior wall being pony, i.e., framed above ground, frostwall under.  I have square footage galore of framed walls and windows and doors, and the material list General section has only the concrete walls where we are fully in the ground.

 

I am certainly not going back and redraw this thing with floor 0 being floor 1 and a 0 being only the stemwalls part, but it may have helped for the Rescheck part, if those Chief area are usable.