Floor, Ceiling ht, Roof , elevation issue, bacony


Designer100
 Share

Recommended Posts

I am just doing a 3D rendering of a bldg. under construction. it is 3 levels with 4 level attic (8ft clg where stair landing is) with stair well to bacony.

When  I call out attic at 4th level it lowers level 3 ceiling (9 ft ht), 2nd level (10 ft), first level 9 ft. . I just mainly have drawin exterior walls with opening to be able 

to design at 3D rendeing. 8 /12 roof pitch over 3rd level masteer bedroom area for atttic. Then 4th level 8 ft ceiling attic going to bacony where ac unit will go with concrete waterproof floor. 

I have 5 of these rendering to do and wanted to see how long one will take before signing agreement with client. tomorrow. 

Any help would be apprectiated . 

 

Chief x8, Windows 10.

Keating 12.2016.plan

Link to comment
Share on other sites

  • 4 weeks later...

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share