As I understand, unlike other parts of the country here in the North East we often using 1x3 strapping, or furring attached to the underside of the ceiling joists (or floor joists) to which we attach the gypsum ceiling. Typically I specify my ceiling thickness as 1 1/4" to account for this; however I just noticed in X8 that my strapping is actually appearing in the framing! This is great accept that I can't figure out how it came up with its dimension, which is showing as 1 1/2"w x 3/4"thick. It should be 2 1/4" wide. I can live w/ that though.
HOWEVER - obviously it needs to run perpendicular to the joists. When I first generated the framing it miraculously was perpendicular, but when I added a beam to the garage, it turned to run parallel.
Any suggestions on how to correct? Plan attached.
thanks,
George
X8
Herwig 6.3.plan