Sunnyroom Posted April 14, 2014 Share Posted April 14, 2014 I have an existing sunroom that was built in 2005. The permit was never signed off. The building dept tells me to get new plans to current code for the sun room. Temo has given me the updated plans for the panels. I have the new ICC reports. I need someone to take the old plans and change out the walls to the new panels and engineering. I will open up the walls and make any changes that occurred which I am told is very little. I need current code plans for this 2005 existing sunroom. Plans and engineering. This is a home located in San Jose California. I can send the architect the new reports, panel plans from Temo etc. Lisa 408-202-1959 lisagault@sbcglobal.net Link to comment Share on other sites More sharing options...
DRAWZILLA Posted April 15, 2014 Share Posted April 15, 2014 You will also need the title 24 energy calc's for permit. 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now