GP202256
Members-
Posts
37 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by GP202256
-
I did everything and thanks, the only thing that did not happen was the flat seat at the truss bottom after rebuild.
-
I got everythiing else to work. But I still do not understand why the wall and ceiling will not connect. I checked the wall hieght and says the same for both. Can anyone explain.I am not looking for someone to do it, just help. Thanks so much NewZip.zip
-
NewZip herschy.zipSo i think i fixed it, thanks. But I cannot get the siccor truss to be a energy heel can you help?
-
I zipped it. Hirschy fl plan 02.13.23 stick build-Final - Copy.zip
-
Why does my ridge change size as it goes toward the overframing?
-
I opened the interior floor and the section of rail was released and I could delete. I have no idea but all resolved . Maybe a glitch but invisible rail worked. Thanks
-
Looked like it would work but then the small section of rail froze inside the bay window.. Yikes. The invisable rail is there.
-
It was done with an auto bay window.
-
I cannot figure out why the railing keeps snapping to the inside. Any ideas of why?
-
I want to frame the addition roof on top of the existing . Ho do I do this so I see it in the framing of the roof? fl plan 11.28.22 option 2 A - over frame.pdf
-
900 series aluminum railings for chief architect
GP202256 replied to GP202256's topic in General Q & A
So I asked if there is there 900 series aluminum railings for chief architect. I was sure that that is what I wanted. Those are a type like other things. Sorry for the confussion. All the best I created my own as suggested. -
Is there 900 series aluminum railings for chief architect
-
i solved it already
-
Why has the cursor changed to a terrain symbol all the time? help
-
sorry for the late response somhow the joist was pasted in the wrong layer,
-
My deck planck dissapear after aouto regenerat, Why?
-
thanks all all set
-
I am sorry for not responding sooner. I tried that but it is saying framing already. The other is positioned on the foundation level.
-
How do I move a few 2x10 decking joists to another layer ? I do not know how they are on the wrong layer.
-
So I cannot reset the plan that I am in currently?
-
How do I get 2x10 decking joists to be automatic when building decks?
-
double layer of deck boards and gap in full return
GP202256 replied to GP202256's topic in General Q & A
I removed the flooring in the room all set, thanks all.