jenmarsch

Members
  • Posts

    36
  • Joined

  • Last visited

Posts posted by jenmarsch

  1. I have tried to catch all the ceiling heights above to fix this, I need the first floor to be 10', client change their mind of course once entire plan is drawn. I am attaching plan file as well. Previously I have simply redrawn the entire plan to change the ceiling height. I dont have time this time. Super frustrating... i haven't found a tutorial that makes the fix. Not sure I'm asking the correct question.

    ceiling_values.png

    REV_McCready_3-15.plan

  2. 6 minutes ago, Renerabbitt said:

    please post your plan so we can take a look..my guess is that your cad line you converted to a terrain perimeter may be on the layer set that cad line was originally drawn on

    entire plan? i  guess just attach it? I changed the CAD line to a terrain perimeter, it had shown on a previous plan, but i have modified so many times, maybe it just wont transfer.

    Nance_3-27.plan

  3. On 3/27/2018 at 2:46 PM, Joe_Carrick said:

    To answer the question,

    1. Create the Arched Openings
    2. Create the Railing Walls off to the side
    3. Open the Railing Walls dbx and check "No Room Definition"
    4. Move the Railing Walls into the Openings.

    Thank you , I will try this, I actually found where you had created valances, I did that to start with, not sure I like the look, I'll try this next.