parkwest

Members
  • Posts

    744
  • Joined

  • Last visited

Community Answers

  1. parkwest's post in Pony wall stemwall foundation was marked as the answer   
    Okay, I think I figured it out.  I thought since the lower wall height was tied to the floor height and the first floor was a slab located at the top of the stemwall -- I went negative 6 inches on the lower wall top and it works.