I have a proposal due tomorrow and been working on this all day. Throwing my hands up in the air now LOL ... HELP!!!
I think i did things backwards. I drew the first floor plan, then started the second floor plan in the attic - decided that was probably not correct, but had the plans finished besides the front elevation.
Did that mess up the roof?
But before i started on the second plan, I tried to put the main taller gable in on the front and the back covered gable roof and I couldn't get them to draw correctly. I tried every avenue I knew and worked too many hours trying to get it to go. I decided hand drawing would have been much faster ...
I need any direction on the main gable in the middle and the porch roof connected to it and the covered roof in the back won't rebuild and I have tried changing all the walls and deleting it and rebuilding. I am at a loss and waiving the white flag on both!!!
THANK YOU IN ADVANCE .....