Automatically generated schedules…items that are added to a cabinet box such as a wall oven or lavatory show up in the schedule but I cannot seem to edit/control the name like I can with a free-standing item like a toilet or fridge. I have tried opening the cabinet dialogue box for that item to alter the individual component data so that the output in my schedule says what I need it to, but aside from renaming the cabinet label and assigning the cabinet as a plumbing fixture I don’t seem to be able to have the right control. Can anyone point me to a tutorial or reference a topic where this is covered? I keep chasing my tail searching for any tips and can’t find anything specific to my issue.