Sorry, somewhat new here. Tried following the above, but not figuring it out. I have a pool wall that has rebar at 8" O.C. spacing. I'm using foundation walls to build the pool shell (unless somebody has a better idea, I'm open to any and all ideas), is there a way to change the material list calculation to be based on 8" O.C. spacing?