In my area of South East Virginia, builders are going to a raised slab. Usually a footer with 2 or 3 courses of block, then filled with sand, insulation board around the inside edge of block, and a slab on top. I'm new to Chief Architect, so what is the best way to do this?
Palmer-Turn-6-foundetails1 (1).pdf