ChiefTesoroTX Posted May 9 Share Posted May 9 I'm about to start marking up all of the drainpipe slab penetrations in a slab-on-grade plan. I couldn't find anything at all showing how others have approached this and I'm looking for a good approach. My thought was to use either a Point Marker or "BMW" marker and then set up a special Dimension layer with dimensions attached to these, to show measurements from the edges of the slab forms so that the PVC can be placed precisely when the forms go up. Am I thinking about this correctly? Link to comment Share on other sites More sharing options...
amddrafting Posted May 9 Share Posted May 9 We use point markers and dimesion them to the slab edge. We add a label for the fixture and room name 1 Link to comment Share on other sites More sharing options...
ChiefTesoroTX Posted May 13 Author Share Posted May 13 Thank you @amddraftingthis is working great for me. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now