COMSTOCKL35

Members
  • Posts

    3
  • Joined

  • Last visited

Everything posted by COMSTOCKL35

  1. Anyone else having issues with x17 locking up when using "Chief Architect Save as PDF"? Was running the beta just fine, since the upgrade on layouts that have multiple "standard" camera views on the layout I'm finding that the time to generate the pdf is drastically increased and or will completely lock up the program, leaving me the only option to force close the program. I've checked all the things i can think of that may be causing this, video card drivers, updates, power status/settings, exc.. only way i was able to get my current project to process was to switch all my standard rendering views to vector view and even still the processing time was almost 4 mins, 19 pages, and just about 19k KB once it finally did process. @600DPi, ANSI B, RTX 4070 Laptop Any thoughts on what could be causing this??
  2. Thanks for the heads up. I’ll go in and fix it in the morning. And comment back when it’s fixed.
  3. Hello everyone, having an issue getting x14 to report the information my estimator is asking for. we primarily focus on remodels, therefore a vast majority of our projects require demo work. we stick estimate and account for sf, lf, area, and each of items for removal. In a lot of cases this is not a across the board or entire area basis or even within complete room. My team has been inquiring if the program has the arability to produce a schedule i can put on layout so they don't have to physically do the calcs for the area of drywall being removed then reinstalled. i understand i have to run a material list to have the program run the total. i have figured out how to get the program to total Base, Casing, Flooring, Ceiling area, electrical and plumbing fixtures. im wanting to see if there is some way i can set this up to pull with the ease of a schedule without having to go in and create a material list for each room involved write down the area from that then say create a room list for every program. thining there might be a macro or some way to achieve this in a custom schedule and have ran into a wall every way ive tried to run it or set it up. i will attach the current project im working on for reference. the rooms im looking to complete said schedule or report are listed in the room area schedule to the right of the 1st floor plan23-6416-Newton-Existing.plan 23-6416-Newton-Existing.zip