RedHouseJP

Members
  • Posts

    6
  • Joined

  • Last visited

Everything posted by RedHouseJP

  1. That worked to re-place them into the first floor wall and then move up. I think I put them in originally while in a 3d view and didn't think of this. They did go into the attic wall- chief auto drew these attic walls so I'm not sure on the "why" they are there...
  2. I have a bathroom with a vaulted ceiling/roof as ceiling and there are 2 transom windows in the upper part of the room that show on the attic plan level, but not the 1st floor plan. Is there a way to have these show on the floor plan for the room below?
  3. Yes, copy/paste between CAD details is working so I will do this for each of my in progress plans so I'll take that approach now that I know it's the most efficient way. Not quite as easy as importing/exporting schedules (hopefully an added feature in the future), but much better than re-creating each schedule from scratch within each plan! Thank you for the knowledge!
  4. Is there a way to modify a name or delete completely a plan view set in an existing plan? Using Premier X13
  5. I have a few in progress plans that I haven't used the schedules features in. Recently, I've learned about and worked on utilizing schedules on one new plan and have these schedules saved into CAD Details in that plan. I am wondering if there is any way to leverage the work I've done creating these schedules in this new plan to add these schedule details into my previously created in progress plan, or is the only way to re-create these customized schedules in all of my in process plans? I understand the correct way to do this is to create a plan template that includes these schedules and plan to do so on future projects, but was hoping for a less time consuming way to update plans I'm working on that I started prior to having my template plan updated to include my schedules.... Any ideas? Using Premier X13