I'm looking for a detail of adding TJI's for a new second story floor above existing 2x6 ceiling framing. I want to keep some space between the new TJ's and old 2x6's so existing wiring can remain in place and so the new TJ's can span in either direction. Need to transfer lateral loads from new framing through the existing bearing walls to the foundation as well. Thanks in advance!