  1. BuilderLFD's post in Floor Framing Option was marked as the answer   
    Yes there is.
     
    Go to first floor Select wall you want to Balloon Frame Open up wall specification dialog box Select Structure tab Check box "Balloon through ceiling above" Check box "Hang Floor platform above on wall" Check box "include ledger" Rebuild framing for your walls and floors. Done.
     
    PS - That will get you your two framed walls.  It appears on your cross section you do not want to hang those joists on the concrete wall, so don't check that box.  But you will need to check the box "Go through floor below" to get your desired effect of the wall.
  2. BuilderLFD's post in Making 1St Floor Flush Inside Foundation was marked as the answer   
    You're going about it wrong.  In your framing specification, you have set your floor joist at 11-1/2" below your floor.  Your floor level is 0, so with 3/4" plywood, the floor joist should be -3/4", not -11.5" as shown.  In order to accomplish what you are trying to do, leave your framing alone, and the let CA do its magic. 
     
    All you need to do is:
    go to your foundation plan, select the concrete wall where you want the joists hung, Open up the wall dialog box  Select the structure tab for that wall Under "Platform Intersections" check the box "Hang floor platform above on wall" Remember, your floor is always zero, so when you changed the floor joist to -11 1/2", the floor stayed at zero, and your joists dropped down.  Hence the gap.  Follow the method I outlined, and your concrete wall goes up with the joists hung as shown in your cross section.
     
    Hope this helps